For remodeling contractors
E-signatures for remodelers: remodeling and home improvement contracts
A kitchen remodel needs both homeowners on the remodeling contract, the selections sheet and every page of the cabinet drawings, and the cabinet order waits until all of it is back. Send each as a PDF for e-signature: each owner signs on their own phone, one at work and one at home, and you countersign once both have.
3 documents a month free. No credit card.
- Each owner signs separately
- Initials on every drawing page
- You countersign last
Why remodelers choose SignThis
Neither owner has to create a login
Couples rarely sit down together to sign. Each owner opens their own email link on their phone and signs without an account or anything to install, so the contract isn't held for the weekend.
Proof of which drawing revision was approved
When an owner says the island was meant to be longer, the sealed revision C, with both owners' initials and a trusted timestamp, shows the layout they approved, and anyone can check it on the verify page.
Design fees agreed before you draw
Some couples shop free drawings to a cheaper builder. A design agreement sent after the first meeting and signed that evening puts your design fee in writing before the designer opens the file.
Selections signed from the showroom lot
Couples pick tile and fixtures at the showroom on a Saturday. The designer sends the updated selections sheet that afternoon, both owners sign it on their phones before they drive home, and the order goes in Monday.
- Remodeling contractMehta householdSigned
- Selections and allowancesKitchen and pantrySigned
- Cabinet drawings, rev. C6 pagesViewed
- Pre-construction sign-offMehta householdWaiting
Signing order
- PM1Priya MehtaHomeownerSigned
- SM2Sam MehtaHomeownerSigned
- GE3Grant EllisonOwner, remodelerSigning now
Sam Mehta signed the selections · 4 min ago
Drawings approved by both owners before cabinets are ordered
On paper: Cabinets were ordered from a drawing one owner okayed by text, and the island arrived six inches off.
With SignThis: Both owners initial every page of the drawing set before you order, and the sealed set is on file.
On paper: The contract waits for a Saturday because both owners have to be at the kitchen table to sign it.
With SignThis: Each owner signs from their own email link on their own phone, with no login, and then it comes to you.
On paper: The tile overage becomes an argument at the final draw, because the choice was made in a showroom.
With SignThis: The selections sheet lists each choice against its allowance, and both owners sign it before you order.
Documents remodelers send for signature
Remodeling and home improvement contracts
Scope, start and completion dates, the draw schedule and your license number in the PDF, signed by both owners and countersigned by you.
Design agreements
The paid design phase agreed before you draw, so the owners know what the plans cost if they decide not to build.
Selections and allowance sheets
Tile, fixtures, counters and hardware listed against each allowance, signed before you order so any overage is agreed in writing.
Cabinet drawings and layouts
Initials for both owners on every page, placed with the Initial every page shortcut, so the layout is approved before anything non-returnable is ordered.
Change orders after demo
Rot, an undersized joist or a vent stack in the wall you meant to remove, priced with the added days and signed before the crew does the extra work.
Pre-construction sign-offs
Working hours, dust walls, which bathroom the crew uses and where the dumpster goes, agreed at the pre-construction meeting and signed by both owners.
One document, start to finish
Cabinet drawings approved before the supplier's cutoff
The Mehtas moved the sink to the island on Monday, and the cabinet supplier needs signed drawings by 5 pm Friday to hold the install date.
Revision C is ready
The designer exports the six-page cabinet drawing set as one PDF, with the sink on the island and the pantry wall unchanged.
Initials on every page, for both
Upload it, add Priya and Sam in any order, use Initial every page, then Repeat for other signers, and place a signature and date for each on the last sheet.
Priya signs at lunch
She reads the elevations on her phone, initials each page and signs. Your document list shows the set still waiting on Sam.
Sam signs, and the order goes in
Sam signs from his laptop between meetings. Both receive the sealed PDF, and you send the signed set to the supplier with over an hour to spare.
What remodelers use most
Initial every page
One shortcut puts an initials field on every page of a drawing set or contract, and Repeat for other signers copies them for the second owner.
Signing in order
Choose in order, and the contract reaches you to countersign only after both owners have signed it, each from their own email link.
Saved contract and selections forms
Your contract, selections sheet and change order saved with their fields in place, so the designer sends the next kitchen's in minutes.
Saving your own templates is included from Standard, and on every business plan.
What is still waiting on an owner
See which selections and drawing sets are still waiting on an owner, and how long your clients usually take to sign.
Insights are included from Professional, and from Business Standard for teams.
Free templates to start from
Change order template
Records a change to the agreed work, with its effect on price and schedule, before the changed work starts.
Estimate approval template
The customer signs off on the scope and price of a job before work starts.
Subcontractor agreement template
Between a general contractor and a trade subcontractor: scope, price, payment, insurance and changes.
Each has a plain-language note on every section, downloads as Word or PDF, and can be sent for signature from SignThis. See all free templates.
What it costs
A one-crew bath remodeler
6 documents a month
contracts, selections and a few change orders
FitsBasic$8 a month6 documents a month · no commitment
A kitchen and bath company
16 documents a month
design agreements, contracts, drawing sets and change orders
FitsProfessional$25 a month200 documents a year · no commitment
A design-build firm with six crews
45 documents a month
contracts, selections, drawings and change orders across jobs
FitsBusiness Standard$35 a seat a monthUnlimited documents, subject to fair use · 3-seat minimum, 12-month commitment
Billed monthly, like for like
- SignThis Basic
- $8 / month$5 the first month · 6 envelopes a month
- DocuSign Personal
- $15 / month5 envelopes a month
DocuSign figures are from its public eSignature pricing, checked November 18, 2026. SignThis is not affiliated with or endorsed by DocuSign, Inc. Compare SignThis with DocuSign
Signing is free for the people you send to. Prices are billed monthly; paying yearly costs 10% less. See every plan and its limits.
Worth knowing before you send
- Many states set what a home improvement contract must include, such as your license or registration number, start and completion dates and the payment schedule, and some cap the deposit. Build those into your contract PDF once and every copy you send carries them.
- Contracts sold in the owners' home can carry a right to cancel within a few days, with wording set by federal or state rules. Put the notice in the PDF and order cabinets after the window closes; the audit certificate dates each signature.
- Have both owners sign the contract, the selections and the drawings, not just whoever answers the email. Add each with their own address so each signature is tied to its own link.
- Send selections and drawings as their own documents rather than attachments to the contract. Each gets its own sealed record, so a later change order points to exactly what was approved and when.
Common questions
Can both homeowners sign the remodeling contract from different places?
Yes. Add each owner with their own email address; they sign from their own links on a phone or computer, without creating an account, and you countersign last if you choose in order. Everyone receives the same sealed copy.
Is there a home improvement contract template?
The one to send is your own, written to your state's home improvement rules with your license number and draw schedule; upload it as a PDF and place the fields once. Free change order, estimate approval and subcontractor agreement templates cover the rest of the job.
Can both owners initial every page of the cabinet drawings?
Yes. The Initial every page shortcut places an initials field on each page for one owner, and Repeat for other signers copies them for the second. Every initial is sealed into the finished PDF, and the audit certificate records when each owner signed.
What if the owners change a selection after signing?
Send a revised selections sheet or a change order as a new document. The signed version stays sealed as it was, so you can show the original choice, the change and when each was approved.
Can clients sign a design agreement before we start drawings?
Yes. Send it as a PDF after the first meeting, with the design fee and who may use the drawings if they build with someone else. Both owners sign from their own email links, and the sealed copy is on file before the designer starts.
How much does SignThis cost?
The free plan sends up to 3 documents a month, with no payment card and no end date. For more, plans start at $8 a month with no commitment, or 10% less when you pay yearly. Signing is free for the people you send to. See every plan and its limits.