Construction contract template
A construction contract sets out the work a contractor will do on someone's property, the fixed price, when each payment is due, the start and finish dates, and how changes, defects and disputes are handled. This template is for a small residential or light commercial job, and it works with the change order, lien waiver and subcontractor agreement in this library.
Sending opens the template in the editor after a short sign-up. 3 documents a month free. No credit card. Downloads need no account.
- Signed by
- Contractor and Owner
- Sections
- 15
- Blanks to fill in
- 21
- Formats
- Word, PDF, e-signature
- Last reviewed
What is a construction contract, and why does it matter?
A construction contract is the agreement between a property owner and the contractor who will build, remodel or repair something on that property. This template is the fixed-price kind, sometimes called a lump-sum contract: the contractor agrees to deliver a described result for a set price and carries the risk if the job takes more labor than planned. Changes to the work, and conditions nobody could see, are priced separately as the job goes.
It matters because the expensive arguments on a job tend to be about something nobody wrote down: what the price included, which allowance covered the tile, whether the delay was the weather or the crew, who pays for the rotten joist behind the drywall. A contract that settles those questions before the first wall comes down protects both sides' money, and it is often the first document a lender, an insurer or a licensing board asks to see.
Work on a home is also among the most regulated kinds of contract. Many states require a written contract above a small amount, the contractor's license number, approximate dates, a cap on the deposit, and cancellation and lien notices in set wording. This template leaves room for those, defers to the law where it sets a limit, and has a section where the notices your state requires are attached and listed.
When to use this template
- You are a contractor or remodeler agreeing a fixed price with a homeowner for one project, such as a kitchen, a bathroom, an addition, a deck or a roof.
- You are an owner who wants the scope, the payment stages and the dates in one signed document before anyone starts demolition.
- The job is light commercial work for a business owner, such as a tenant fit-out or a small office renovation.
- The job is bigger than a repair visit, so a signed estimate on its own would leave too much open.
When it is not the right document
- Cost-plus or time-and-materials work, where the owner pays actual costs plus a fee. The payment terms here assume a fixed price.
- A quick repair or small job where the estimate approval in this library is enough.
- Public works, new homes built for sale, and projects administered by an architect, which use their own forms and required clauses.
- Bringing a trade onto your own job. That is the subcontractor agreement.
The construction contract template, section by section
The full text is on the left. Beside each section is a plain-language note on what it does and what to decide before you send it. Words in [brackets] are blanks you fill in.
Construction Contract
This Construction Contract (the "Contract") is made on [Date of the contract] between [Contractor's legal business name] (the "Contractor"), whose business address is [Contractor's business address], and [Owner's name] (the "Owner").
The Contractor will perform the work described in this Contract at [Job site address] (the "Job Site") for the fixed price stated in it. This Contract takes effect when both parties have signed it.
1. The work
The Contractor will provide all labor, materials, equipment and supervision needed to complete the following work (the "Work"):
[Description of the work]
The Contractor will perform the Work in a good and workmanlike manner, following the plans and specifications attached to this Contract, the manufacturers' instructions and the building codes that apply.
2. What is not included
The Price does not cover the following, and none of it is part of the Work:
[What is not included]
Work that this Contract does not describe is added only through a change order under section 8.
3. Contract documents and required notices
The following plans, specifications, notices and other documents are attached to this Contract and are part of it:
[Attached plans, specifications and notices]
If these documents conflict, a signed change order controls over this Contract, and this Contract controls over the other attached documents.
4. Price and allowances
The Owner will pay the Contractor a fixed price of [Fixed price] for the Work (the "Price"). The Price changes only through a signed change order.
The Price includes the following allowances for items the Owner will select later:
[Allowances, or "none"]
If the cost of an item the Owner selects is above its allowance, the difference is added to the Price. If it is below, the difference comes off the Price. Each adjustment is made by change order.
5. Deposit and payments
The Owner will pay a deposit of [Deposit] when both parties have signed this Contract. If the law sets a lower limit on deposits for this kind of work, the deposit is that lower amount. The deposit is part of the Price, not an extra charge.
The rest of the Price is paid in stages as the Work progresses:
[Payment stages]
The Contractor will send an invoice when each stage is reached, and the Owner will pay it within [Days the Owner has to pay each invoice] days. If the Owner disputes part of an invoice, the Owner will tell the Contractor why in writing and pay the rest on time.
With each payment, the Contractor will give the Owner a lien waiver for the amount paid, in the form the law of the state where the Job Site is located requires or allows, and, if the Owner asks, lien waivers from the subcontractors and suppliers paid for that stage.
The final payment is due when the Work is complete, the final inspection has passed and the items on the walk-through list in section 6 are finished.
6. Start and completion
The Contractor will start the Work on or about [Start of the work] and complete it as follows: [Completion date or time to complete].
The time for completion is extended by delays the Contractor did not cause and could not reasonably avoid, such as severe weather, changes, late decisions or payments by the Owner, permit or inspection delays, hidden conditions and shortages of materials, provided the Contractor tells the Owner in writing promptly after learning of the delay.
The Work is substantially complete when it can be used for its intended purpose with only minor items left to finish. The parties will then walk through the Work together and list the items that remain, and the Contractor will finish them within a reasonable time.
7. Permits, licenses and inspections
The permits and inspections the law requires for the Work will be obtained and arranged by [Who obtains permits]. Permit fees are included in the Price unless section 2 says otherwise.
The Contractor holds the licenses and registrations the law requires for the Work. Its license or registration number is [Contractor's license or registration number].
8. Changes
Either party may propose a change to the Work. A change to the Work, the Price or the time for completion takes effect only through a written change order that both parties sign before the changed work starts. Each change order describes the change and states its effect on the Price and on the time for completion.
The Contractor is not required to perform changed work without a signed change order. In an emergency, the Contractor may take the steps needed to prevent injury or damage to property, and the parties will put that work in a change order as soon as they reasonably can.
9. Hidden conditions
If the Contractor finds a condition at the Job Site that was concealed, or could not reasonably have been discovered before this Contract was signed, such as rot, water damage, termites, faulty wiring or plumbing, buried obstructions or hazardous materials, the Contractor will stop the affected part of the Work and tell the Owner promptly.
Work needed because of such a condition is not included in the Price. The affected part of the Work resumes when the parties sign a change order for it. Until then, the Contractor may do what is reasonably needed to make the area safe and weathertight.
10. The Owner's part
The Owner will:
(a) give the Contractor access to the Job Site during the working hours in section 11, with water and electricity at no charge;
(b) make the selections and decisions the Work depends on by the dates the Contractor reasonably asks for them;
(c) move belongings, vehicles and pets out of the work area and keep children and visitors out of it;
(d) tell the Contractor about any condition at the Job Site that the Owner knows of and that could affect the Work or anyone's safety; and
(e) make the payments under section 5 when they are due.
The Owner confirms that it owns the Job Site, or has the owner's written authority to order the Work.
11. Working on site
The Contractor will work at the Job Site during these hours: [Working hours on site]. Work outside those hours needs the Owner's agreement, except in an emergency.
The Contractor will keep the work area reasonably clean, remove its debris, protect the parts of the property that are not being worked on, and repair damage that the Contractor or its workers cause.
The Contractor may use subcontractors for parts of the Work. The Contractor remains responsible to the Owner for their work and will pay them for it.
12. Insurance
Before starting the Work, the Contractor will have commercial general liability insurance with limits of at least [Contractor's liability insurance limits], and workers' compensation insurance as the law requires, and will keep both in force until the Work is complete. The Contractor will give the Owner certificates of insurance on request.
The Owner will keep its property insurance on the existing building in force during the Work, and will tell its insurer about the Work if the policy requires it.
13. Warranty of workmanship
The Contractor warrants that the Work will be free of defects in workmanship for [Workmanship warranty period] after substantial completion. If the Owner tells the Contractor in writing about such a defect within that period, the Contractor will correct it at no charge within a reasonable time.
The manufacturers' warranties on materials and equipment pass through to the Owner, and the Contractor will hand over the warranty documents it receives.
This warranty does not cover normal wear, misuse, lack of maintenance, materials the Owner supplied, or work done by others. It is in addition to any warranty the law gives the Owner, and does not limit a warranty that the law does not allow a contract to limit.
14. Cancellation and ending the contract
The Owner may cancel this Contract within any period the law gives a consumer to cancel, by the method the law sets, and is entitled to the refund the law provides. This Contract does not shorten or limit that right.
If the Owner does not pay an undisputed amount when due, the Contractor may stop work after giving written notice, and may end this Contract if the amount is still unpaid 10 days after the notice. The Owner then pays for the Work done and for materials ordered for the Work that cannot reasonably be returned.
If the Contractor abandons the Work or does not perform it as this Contract requires, the Owner may give written notice describing the problem. If the Contractor does not begin to correct it within 10 days after the notice, the Owner may end this Contract, have the Work completed by others, and charge the Contractor the reasonable cost of completion above the unpaid balance of the Price.
15. Disputes and general terms
If a dispute arises, the parties will first try to settle it by talking directly. If they have not settled it within 15 days after one of them asks in writing, it will be resolved as follows: [How unresolved disputes are decided]. While a dispute is being resolved, the Contractor will continue the Work and the Owner will continue to pay amounts that are not in dispute, unless this Contract has ended.
The law of the state where the Job Site is located governs this Contract. This Contract, with its attached documents and signed change orders, is the whole agreement between the parties about the Work and replaces earlier estimates, bids and discussions. A change to it needs a writing that both parties sign.
If a court declines to enforce any part of this Contract, the other parts still apply. Nothing in this Contract takes away a right that the law gives the Owner and does not allow the Owner to give up. Notices may be sent by email to the addresses the parties use for the Work.
The Contractor and the Owner may sign this Contract electronically, each on a separate copy, and those copies together are one contract.
The Contractor and the Owner agree to the terms of this Contract.
Contractor
SignatureDate
Name
Title
Owner
SignatureDate
Name
Check before you send it
A template cannot know your state, your industry or your deal. These are the points most likely to need a change, and the ones to raise with a lawyer.
- Home improvement rules. Many states prescribe what a contract for work on a home must contain. California and New York require a written contract for most home improvement jobs over $500, and Massachusetts for residential jobs over $1,000. Common requirements are the contractor's license or registration number, approximate start and completion dates, a description of the work and materials, the price and payment schedule, and notices in set wording. Massachusetts' statute also lists the parties' Social Security numbers among a contract's contents, while the state's sample contract language asks for a federal ID number where one applies. This template has no blank for either, so ask a Massachusetts lawyer how to meet that item.
- Deposit limits. California limits the down payment on home improvement work to 10 percent of the price or $1,000, whichever is less. Massachusetts limits it to one-third of the price or the cost of special-order materials, whichever is greater. New York requires payments received before substantial completion to be held in an escrow account unless the contractor provides a bond or contract of indemnity instead, and Florida sets permit and start deadlines for a contractor who takes more than 10 percent at the outset.
- The right to cancel. Under the FTC's Cooling-Off Rule a buyer generally has three business days to cancel a sale of $25 or more made at the buyer's home, and the seller must give a written notice and cancellation forms at signing. Many states add cancellation rules of their own for home solicitation or home improvement sales.
- Lien notices. Some states require a notice about lien rights inside the contract itself. Florida, for example, requires a lien law notice in capitalized 12-point boldface type in direct contracts over $2,500 for work on homes of up to four units.
- Licensing. Most states license or register contractors for some or all work, and some cities add their own registration. Check that the license covers this kind of work and is current where the job is.
- Older homes. Firms doing renovation, repair or painting that disturbs paint in homes, child care facilities or kindergartens built before 1978 must be EPA- or state-certified and follow lead-safe work practices.
- Loans and insurance claims. When a construction loan or an insurance claim pays for the job, the lender or insurer may set the payment stages, inspections and lien waiver requirements. Match the payment schedule to theirs before signing.
How to send it with SignThis
- Fill in the blanks. Choose "Send this for signature". After a short sign-up you are asked for the details: names, dates, amounts. Anything you skip stays a blank line.
- Add who signs. Add the Contractor and Owner, in that order, with their email addresses.
- Place the blocks. Press Place signature blocks to put signature, date and name blocks on the signing lines, then check them. Add a Text block on any blank you want a signer to fill in.
- Send. Each person gets a private link and signs in their browser. When the last one signs, everyone receives the sealed PDF and its audit certificate.
To change the wording first, download the Word file, edit it, save it as a PDF and upload that instead.
Questions about the construction contract template
What should a construction contract include?
At a minimum: the parties and the property, a detailed description of the work and what is excluded, the price and payment stages, start and completion dates, who obtains permits, how changes are made, insurance, the workmanship warranty and how disputes are resolved. For work on a home, add whatever your state requires, such as the license number and cancellation and lien notices.
What is the difference between a fixed-price and a cost-plus contract?
Under a fixed-price contract the owner pays a set amount for a defined result, and the contractor keeps any savings or absorbs any overrun. Under a cost-plus contract the owner pays the actual cost of labor and materials plus a fee or percentage, which suits work that cannot be fully defined at the start but leaves the owner carrying the cost risk. This template is fixed-price.
How much can a contractor ask for up front?
It depends on the state. California caps the down payment on home improvement work at 10 percent of the price or $1,000, whichever is less, and Massachusetts at one-third of the price unless special-order materials cost more. Many states set no cap; where there is none, a deposit close to the cost of the materials ordered at the start is common.
Does a construction contract need to be notarized?
Generally no. The owner and the contractor sign it, and electronic signatures are commonly used for it. Some papers connected to a job, such as documents recorded with the county or lien waivers in certain states, can need a notary, and those follow their own rules.
How does this contract work with a change order or an estimate approval?
Use an estimate approval for a small job where the signed estimate is the whole deal, and this contract for a larger one. Once this contract is signed, each change goes on its own change order, and each payment can be exchanged for a lien waiver. All of them are in this library. The change order and estimate approval call the property owner the Customer, so on a change order under this contract the Owner signs as the Customer, with this contract's date and job site.