How-to guide
How to write a bid proposal, from site visit to signed acceptance
Walk the job and measure, then write the work by area with quantities and materials, and list what is excluded. Price materials, labor, subcontractors, equipment and permits, add overhead and profit, and say whether it is a fixed price or an estimate. Give the deposit, the payment stages and how long the bid holds, then have the customer sign to accept.
Checked November 18, 2026
Steps at a glance
- Walk the job and measure
- Write the work by area
- List the exclusions
- Build the price
- Choose fixed price or estimate
- Set the deposit and payment stages
- Say how long the bid holds
- Send it for the customer's signature
Other ways below: A bigger job, on a construction contract · Answering an owner's invitation to bid
What you need
- Measurements, photos and notes from the site visit
- Current material quotes from your suppliers and your labor rates
- Your license or registration number, where the job's state or city issues one
- The property owner's name, the job address and an email address for them
Way 1 of 3
A bid the customer accepts on the estimate approval
Best when: The job is a repair, small remodel or service visit, below the amount at which your state requires a full home improvement contract.
Walk the job and measure
Take dimensions, count fixtures and openings, and photograph what is there now. Note access, parking, where materials can be stored and anything that could be hiding damage.
Write the work by area
List what you will do room by room or area by area, with quantities, materials, brands and finish levels. Write it so your crew could build from it without calling you.
List the exclusions
Name what this customer might assume is included and is not: permit fees, painting after the repair, hauling away old fixtures, work on anything found behind the walls.
Build the price
Add materials with an allowance for waste, labor hours at your rate, subcontractor quotes, equipment rental, permit fees and disposal. Then add your overhead and profit as a markup on that total.
Choose fixed price or estimate
A fixed price changes only by change order, so you carry the risk of slow work. An estimate bills actual time and materials; write the percent it may run over before you must ask the customer.
Set the deposit and payment stages
Fill in the deposit and tie the rest to visible stages, such as delivery of cabinets or a passed inspection. Several states cap deposits on home improvement work, California among them.
Look up the cap for the job's state before filling this in. The template drops the deposit to any legal limit, yet collecting more than the cap can itself be a violation.
Say how long the bid holds
Fill in the date the estimate stays open until, along with the expected start date and how long the work should take. Make that date 14 or 30 days after the day you send it.
Send it for the customer's signature
On the estimate approval template, choose Send this for signature, fill in the blanks, and add the customer first and your business second. Set Expires after to the same 14 or 30 days, so the request closes with the bid.
Way 2 of 3
A bigger job, on a construction contract
Best when: The job has plans, several trades, payment stages tied to inspections, or a firm completion date.
Start from the construction contract
Open the construction contract template, which is fixed-price and has blanks for allowances, payment stages, insurance limits and a workmanship warranty.
List plans and required notices
In the attachments blank, name each drawing and specification with its date, plus each notice your state requires for home work, such as the right-to-cancel notice. To send those pages with the contract, download the Word file, fill it in, add them at the end and save it all as one PDF.
Tie payments to inspections
Write each payment against a stage the owner can see, such as framing passing inspection, and plan to hand over a lien waiver with each payment.
Send it to every owner
Choose Send this for signature, or upload your combined PDF at Send a document for signature. Add your business first and each owner of the property after it, so everyone with a say over the house signs.
Way 3 of 3
Answering an owner's invitation to bid
Best when: A business or public owner has issued bid documents with their own form, deadline and requirements.
Read every bid document and addendum
Addenda change the drawings, quantities or deadline after the first release. Confirm you have them all and acknowledge each one where the form asks.
Price their line items exactly
Fill in the owner's bid form as laid out, with a price on every line, so your number can be compared with the others.
Include what the documents ask for
Add any bid bond, insurance certificate, license copy or reference list the documents require. A missing item can disqualify an otherwise good bid.
Submit before the deadline
Deliver it by the method and to the place the documents name. Many owners refuse a bid that arrives after the deadline, however good it is.
Other ways people ask
How to write a bid
A bid is a price for a defined piece of work, open for a stated time. Write the scope, the exclusions, the price and its terms, then the date it expires, and ask for a signature to accept it.
How to write a construction bid for a homeowner
Homeowners compare bids line by line, so make yours easy to compare: the same areas in the same order, materials named, and every exclusion stated. A bid that lists what it leaves out often looks dearer than one that hides it, until the extras arrive.
How to write a proposal for a bid on someone else's scope
When the customer hands you their scope, price it as written and add a short list of clarifications: what you assumed, what you priced as an allowance and what you left out. Those lines become part of what they sign.
If something goes wrong
- Material prices rise before the customer signs
- Keep the bid's open-until date and the request's Expires after setting the same, so nobody can sign after the price has lapsed. After that, re-price and send a new version rather than honoring last month's number.
- You find rot or bad wiring once work starts
- The estimate approval's hidden conditions section has you stop that part of the work, tell the customer and agree a change order before going on. Photos help the customer agree quickly.
- The customer wants to cancel days after signing at home
- The FTC's Cooling-Off Rule lets buyers cancel many sales made at their home until midnight of the third business day, and the seller has to give notice of that right and two cancellation forms. Where it applies, hand both over with the bid.
- The customer changes their mind on a finish mid-job
- Write a change order with the new price and the effect on the dates, and have it signed before the changed work starts.
Worth knowing
California's contractor board says home improvement jobs above a small total of labor and materials need a written contract that gives the contractor's address and license number, and it limits most down payments to 10 percent of the price or a fixed sum, whichever is less. Under the FTC's Cooling-Off Rule, many sales made at a buyer's home can be cancelled for a full refund until midnight of the third business day. Other states set their own rules, so read this as general information.
Questions
What should a bid proposal include?
Your business details and license number, the customer and job address, the work by area, the exclusions, the price and whether it is fixed, the deposit and payment stages, the start date and duration, how long the bid is open, and signature lines for both sides.
How long should a bid be good for?
Most contractors hold a bid for two to four weeks, less when lumber or copper prices are jumping. Print the date on the bid and match the signing request's expiry to it, choosing 14 or 30 days.
Does a bid need my contractor license number?
In many states, yes. California's contractor board, for example, says a home improvement contract must give the contractor's name, address and license number. The estimate approval template has a blank for it.
Can a customer accept a bid by e-signature?
Generally yes. The US ESIGN Act and the states' UETA laws generally let an electronic signature accept a contract for work like this. Some notices tied to home improvement sales have their own delivery rules, so attach any your state requires to the PDF.